COMMERCIAL - PUBLIC - HOSPITALITY - SCHOOLS - COMMUNITY PROJECTS

San Carlos Life Science Building

Project Team: Prince Street Partners, Brick., South Bay Construction, BKF Engineers (civil), Mar Structural Design (Structural)

Description: 3-Story R&D Building, 2 Levels of Basement, Uplift Support Piles

Landmark Towers (21 Stories) Proposed for Construction in Milpitas

Carriage House (Museum)

Project Team: Rosekrans Architects, Gonsalves & Stronck, Rinne & Peterson Structural Engineers

Description: 3-Story Museum Building Adjacent to Historic RWC courthouse

Menlo Gateway Office Building

Project Team: Heller Manus Architects/ Magnusson Klemencic Associates

Description: 7-Story Office Building in Menlo Park, Supported on Deep Driven Pile Foundations

Station 1300 Menlo Park

Project Team: Bar Architects/ Hohbach-Lewin (Structural)/ BKF Engineers (Civil)

Project Description: 222,000 Square-Feet of Commercial Space + 183 Dwelling Units + 2 Levels of Underground Parking

Commercial Logos 1.png

Project Name: City of Palo Alto Public Safety Building

Project Team: Nova Partners (CM)

Project Description: Three-story Public Safety Building over an operational basement and associated below grade parking for staff. The building will house the Police Department, 911 Emergency Dispatch Center, the Emergency Operations Center, the Office of Emergency Services, and the administration needs of the Fire Department. Public parking is located in the California Avenue Parking Garage. See Project to the right.

Project Name: City of Palo Alto 350 Sherman Avenue Parking Garage

Project Team: Nova Partners (CM)/ Watry Design (Architect)/ SOHA Engineers (Structural)/ PB&A (Shoring)

Project Description: 636-Car Parking Garage with 2 Levels of Below Grade Parking. Sophisticated Dewatering + Shoring Required.

Menlo Gateway Hotel Nia

Project Team: Cunningham Group (Architect)/ Nishkian Menninger (Structural)/ Kimley-Horn (Civil)

Description: 11-Story High-End Hotel Building Supported on Deep Driven Pile Foundations. A part of the larger Menlo Gateway Project

Project Name: Moffett Gateway Campus

Project Team: DES Architects + Engineers (Architect + Structural)/ BKF Engineers (Civil)

Project Description: Two 7-story Class 2 Towers. LEED Platinum. All Buildings Supported on Auger Cast Piles.

650 Live Oak Menlo Park

Project Team: Minkoff Group/ Brick. (Architect)/ Mar Structural Design/ Sandis Associates (Civil Engineer)

Project Description: 2-3 Story Mixed-Use Building Over 2 Levels of Underground Parking

romig_logos_commercial.jpg

278 University Palo Alto

Project Team: Hayes Group Architects

Project Description: 4-Story Mixed Use Building on University Avenue

385 Sherman Avenue, Palo Alto

Project Team: Minkoff Group/ Brick. (Architect)/ ZFA Structural Engineers/ Sandis Associates (Civil Engineer)

Project Description: 3-Story Mixed-Use Building Over 2 Levels of Underground Parking. Complex Dewatering and Shoring .

Park James Menlo Park Hotel

Project Team: Hornberger + Worstell, Inc. (Architect)/Nishkian Menninger (Structural)/ BKF Engineers (Civil)

Project Description: 4-Story Boutique Hotel with 1 Level Underground Parking in the Heart of Menlo Park. Constructed on an old Gas Station site

Alma Street & Lytton 4-Story Mixed-Use Building

Project Team: Korth Sunseri Hagey Architects/ Nishkian Menninger (Structural)/ Lea & Braze Engineering (Civil)

Project Description: 4-Story Mixed Use, 3 Levels of Underground Parking on a Gas Station Clean-up Site

Project Name: Woodside Priory School

Project Description: New School Buildings (Benedictine Square + Science Square)/ Sports Field, and General Campus Improvements

Audi Palo Alto

Project Team: Pronto Inc (Architect)/ Morris Shaffer Engineering (Structural)/ Avila Construction (GC)

Project Description: Modern and Visible Audi Showroom in Palo Alto

romig_logos_school.jpg

Project Name: 317 University Avenue Palo Alto

Project Team: Hayes Group Architects/ Adamo & Associates, Inc. (Structural)

Project Description: Mixed-Use Remodel/Addition

Project Name: City of Palo Alto Colorado Transformer Replacement

Project Team: Peoples Associates Engineers (Structural)

Project Description: Replacement of pads for high voltage transformers at Colorado Substation in Palo Alto. Tight access drilling required.

2995 Middlefield Palo Alto

Project Team: Hayes Group Architects/ Sierra Engineering Group (Structural)

Project Description: New Commercial Building in Downtown Palo Alto

Project Name: 524 Hamilton Palo Alto

Project Team: Hayes Group (Architect)/ Morris Shaffer Engineering (Structural)

Project Description: Steel Framed 1,100 SF Mixed-Use Building. Mat foundation selected as a cost-effective alternative.

Owens Corning Baghouse Structure

Project Team: Peoples Associates (Structural)

Description: Baghouse Structure with new ducts connecting existing building to new structure, supported on a mat slab.

Sustainable Apartments El Cerrito

Project Team: Toby Long Design (Architect)

Project Description: Modular/Pre-Fabricated Apartment Building. Liquefaction Analysis using CPT Data, Shallow vs. Deep Foundation Alternatives Explored

commercial logos 2.png

Defenders Lodge - Accomodation for Veterans at Palo Alto VA Hospital

Project Team: RYS Architects/ Sierra Engineering Group (Structural)

Mid Peninsula Open Space - White Barn Structural Stabilization

Project Team: ZFA Structural Engineers

Fire Station No. 11 - Fremont

Mid Peninsula Open Space - White Barn Structural Stabilization

Project Team: ZFA Structural Engineers